Friday, December 10, 2010

Building the box for the final

These are some pictures of the process of building the box. Carlo designed the box and Keegan and Josiah helped build it. I was in New York for thanksgiving break during this process, but was mainly responsible for finishing it, which involved sanding and staining the wood with polyurethane.

This design which is mainly driven by our change to a horizontal surface, also invites for interaction because of the form. I personally think it is successful and a significant improvement from our last design.






No comments:

Post a Comment